Korean War History
From Kisarazu, Japan to Pohang Dong, Pusan, the Naktong, Panmunjom, and Line Golden, the Korean War history shows the battalion doing exactly what combat engineers are asked to do: move the fight, hold the roads, bridge the gaps, and clean up what war leaves behind.
Activation in Japan and Movement to Korea
The battalion activated in Japan on 15 March 1950 and moved rapidly to Korea in July 1950.
The 14th Engineer (C) Battalion was activated at Kisarazu, Honshu, Japan on 15 March 1950 where it performed routine engineering tasks as part of the occupation forces in Japan.
The Engineers were attached to the 1st Cavalry Division on 7 July 1950 for movement to Korea. The unit was alerted to move from Kisarazu Air Force Base to Camp McGill, Japan where it would be loaded aboard APA's and LST's.
It was a warm and sultry day when on 18 July, all units of the battalion came ashore at Pohang Dong, Korea with the mission to control the unloading and movement of supplies from the docks. Battalion Headquarters was set up in a schoolhouse near the Port. The Battalion consisted of the Battalion Headquarters, Headquarters and Service Company, Company A, and attachments of Company A, 43rd Engineer Construction Battalion, and Company D, 13th Engineer (C) Battalion, totaling thirty-two Officers, three Warrant Officers, and 648 Enlisted Members.
During their time as Port Battalion, the men of the 14th unloaded an estimated 270,000 tons of supplies and equipment. Dock and landing facilities were improved as well as roads leading from the dock area. A water point was set up and an average of 20,000 gallons a day was dispensed.
On 26 July, the Battalion was relieved from attachment of the 1st Cavalry Division and reverted to the control of the Eighth Army; they were relieved of assignment as Port Battalion, and prepared to move to Waegwan, Korea. On 28 July, the Battalion was moved eighty-three miles to Pusan in support of the 25th Infantry Division, setting up a bivouac in an abandoned school building on the northern edge of town. Weather was inclement, raining all day.
The Battalion was on the move again, 31 July, north to Taegu, Korea, and bivouacked at the Taegu racetrack.
On 1 August 1950, while the Battalion was bivouacked at the racetrack in Taegu, they received the order attaching them operationally to the 24th Infantry Division, who in turn attached them to the 21st Infantry Regiment. The Battalion formed a forward and rear CP; the forward CP with Companies A and C immediately departing Taegu for a new bivouac site near Tuksong Dong.
Pusan, Taegu, and the Naktong
The battalion shifted from port work to combat engineer support in the defense of the Pusan Perimeter and the Naktong River line.
2 August, Company A was assigned the mission of preparing the 650-foot bridge across the Naktong River at Tuksong Dong for demolition. Company C was assigned the task of preparing the road leading out of Koryong for demolition. The next day, after transporting the 17th Korean Regiment from the front lines across the bridge, Company C blew their road craters. Although strafed by enemy aircraft 0445 that morning, Company A successfully prepared the bridge and blew it after Company C crossed the bridge at 0701. Total demolition used on both road and bridge amounted to over eight thousand pounds, composed of TNT, C-2, mines, and cratering charges.
On 15 August, per General Order 196, HQ, Eighth U.S. Army, dated 4 August 1950, Company A, 43rd Engineer Construction Battalion became Companies B and D, 14th Engineer (C) Battalion, and the 13th Engineer (C) Battalion became Company C, 14th Engineer (C) Battalion. COL Harry E. Burcher assumed command of the Battalion from MAJ H.A. MacCord.
The Battalion spent the rest of the month conducting combat engineer operations in the defense of the Naktong River and the defense of the Pusan-Taegu MSR. This consisted of laying mine fields, setting booby traps, laying wire, setting up defense perimeters, repairing and maintaining roads, and guarding bridges.
During the month of September 1950, the Battalion participated in three important phases centering on the build-up, attack and breakthrough of the Pusan Perimeter, Operation Castle. The first phase consisted of repairing and maintenance of the main supply route leading from Pusan to Taegu.
The second phase consisted of construction of defensive positions paralleling the Taegu-Ulsan Highway and a River Crossing Operation on the Naktong River for the 1st Cavalry, I Corps, Eighth Army and the 1st ROK Division.
The third phase was highlighted by the problems that were encountered by the Battalion due to the rapid advance of the Infantry effecting an equally rapid advance for the Engineers to keep up. They maintained and built bridges with the utmost efficiency and speed with which materials were made available and on hand. Several timber trestle bridges were constructed over the course of the month.
The soldiers were utilized to dig foxholes, gun emplacements, and construct barbed wire entanglements. Thousands of civilian laborers were enlisted to help in the tasks of filling sandbags and constructing barbed wire fences.
October 1950 marked the Battalion's movement from Sanju to P'yongyang, Korea. Much energy was spent moving the Battalion and its heavy equipment, and at the same time maintaining a working organization.
Breakout, River Crossings, and Withdrawal
September through December 1950 brought rapid movement, ferry operations, bridge work, demolitions, Task Force Allen, and support across Korea.
The Battalion conducted Ferry Operations on the Imjin River moving 2,528 vehicles across in six days between 6 and 12 October. They later conducted Ferry Operations on the Yesong River, also participating in an assault river crossing on the Taedong River in support of the 38th Regiment of the 1st ROK Division. The Battalion constructed two Bailey bridges, one on the Taedong River and one on the Seoul-Munson-Ni Highway.
Considering the terrain, road conditions, the number of rivers and bridges encountered, and the time involved, all missions were completed in excellent time and aided considerably in the final rout of the enemy forces. Bridges and approaches to bridges were improved. Civilian labor filled in excess of 15,000 sandbags the emplacement of which the Battalion oversaw.
November 1950 saw the Battalion (less Company A) committed as part of "Task Force Allen" in the defense of Kunu-Ri. On 4 November at 1100 hours, Company C was committed as Infantry north of Kunu-Ri to cover the withdrawal of friendly forces (two officers and five enlisted were wounded).
On 13 November, Company A received a letter of commendation for the excellent work in repairing a caved-in road, saving twenty-six tanks of the 6th Medium Tank Battalion (Gen. Patton's tanks) that were trapped during the rapid withdrawal from Unsan (2 November). The Battalion was responsible for road repair from Anjou to Kunu-Ri.
The Battalion was passed around from command to command during the course of the month including the 19th Engineer Combat Group and I Corps. All troops were treated to a plentiful Thanksgiving dinner on the 25th, which they thankfully devoured. By the end of the month, the Battalion was back together as one unit working out of P'yongyang. The one exception was 2nd Platoon, Company A, which was attached to the 1st ROK Division to stand by to demolish the bridge in Anju.
During the month of December 1950, the Battalion was involved a multitude of engineer missions consisting of MSR and bridge maintenance, the Sinsun-Ju and P'yongyang demolition missions, road blocks, security of existing bridges, emplacing barbed-wire entanglements, machine-gun, mortar and artillery emplacements, and road reconnaissance. Company A remained in direct support of the 1st ROK Division.
Throughout the months of January and February 1951, the 14th Engineers were engaged in demolitions, extensive road re-con and field fortifications for the Turkish Armed Forces Brigade. These duties had the dual objectives of delaying the advance of the enemy to the maximum extent possible, and to ensure an orderly, safe and rapid withdrawal of friendly forces to successive predetermined locations offering better defensive positions should such a withdrawal become necessary.
The main projects assigned consisted of road maintenance from the northern edge of Seoul to the southern edge of Yongdong-Po, and maintenance of the shoofly railroad bridge across the Han River. During the early part of the period, this work required an all-out effort because of the difficult icy conditions that prevailed in the Han River and the number of snowfalls which affected the trafficability of the main supply routes. As the advance of the enemy progressed towards Seoul, action became imminent on the disassembly of the M-4 bridge. Company A was relieved temporarily from direct support of the 1st ROK Division and ordered to construct field fortifications in the defensive zone of the 29th British Brigade north of Seoul.
On 17 January, a work detail of nine enlisted men from Company A were ambushed by approximately one hundred guerillas as the detail started to load gravel into their truck approximately twenty miles south of Kumsan. The truck was demolished, the entire detail was killed and one guerilla was slain.
Other projects consisted of Anyange-Ni road repair, Chonju road and bridge repair, Suwon road and bridge repair, Suwon and Kimpo airport repair, and road and bridge construction between the Kum and Naktong rivers. The Battalion was constantly battling with shortages in both personnel and supplies. A visible morale boost occurred on 21 February at which time the CG of I Corps, LTG Milburn, accompanied by his Chief of Staff BG Van Brunt, and the Corps Engineer, COL Itschner, honored the battalion with their presence at a ceremony held for the purpose of presenting awards.
1951: Roads, Bridges, Peace Camp, and Line Golden
In 1951 the battalion supported I Corps, the 1st ROK Division, the Commonwealth 29th Independent Infantry Brigade Group, Panmunjom, and Line Golden.
March and April 1951 saw the Battalion conducting bridging operations on the Han River for the 25th and 3rd Infantry Divisions. They were engaged in extensive road and bridge maintenance between the Han River and the Pukhan River and north to the Imjin River. The primary purpose was to increase the combat effectiveness of I Corps as it advanced to the various phase lines during its limited assault on the enemy, but also to reconstruct roads and bridges previously destroyed during the withdrawal of 28 November 1950. Company A remained in direct support of the 1st ROK Division.
The Battalion experienced serious shortages in spare parts for engineer equipment, chemical and water points. It should be noted that the Battalion conducted combat engineering missions for Task Force Growdon, and participated in Operation Wallsend for the Commonwealth 29th Independent Infantry Brigade Group; also, the defensive construction of Line Golden north of Seoul. LTC James E. Linden assumed command of the Battalion from COL Harry E. Burcher on 21 March.
In May of 1951, Company A received the Meritorious Unit Commendation and a present of a captured bull from the First ROK Division in acknowledgement of their superb support of the division during its advance north of Seoul.
The primary mission of the Battalion during this period was to bring all routes up to the condition where they could sustain Class 50 traffic in all types of weather, increasing the combat effectiveness of the Corps and its supporting units. This consisted of extensive road and bridge construction and reconstruction in the I Corps area. The next phase began with the successful repulsing of the enemy at the Line Golden and their eventual rout northward to the Imjin and Han Rivers.
Two railcars and three truckloads of seriously needed engineer supplies were finally delivered to the Battalion from Pusan. Water points were maintained and once serious shortages in personnel were finally being filled with new troops.
21 June 1951 saw the Battalion with a new commander as LTC James E. Linden was replaced by MAJ Charles E. Wright. The Battalion continued with extensive road and bridge construction and reconstruction in the I Corps area, this was done with the help of much indigenous labor. Serious shortages in radio operators and repairmen were being offset through rigorous training of personnel. Battalion command began experimenting with possible mottos for the battalion, the current one being "Ta Na!" (Let's go).
July 1951 found the Battalion with critical shortages of qualified personnel for specialized positions. Generally speaking, the replacements that the Battalion was getting were in the grade of E-2. Officers and men of higher rank were being rotated out faster than they could be replaced. The first half of the month concentrated on maintenance of assigned roads. In the second half, the principle function was the construction of fortified defensive positions on line "Kansas" in support of the 1st Cavalry Division and the 3rd Infantry Division. Life became more "normal" as the men were treated to a couple movies each week, and PX items began to be more available, and beer and soft drinks were being supplied. Recreational facilities were also being constructed.
Flash floods were an imminent concern during the months of August and September 1951. These months kept the Battalion busy repairing roads and bridges because of the heavy rains received, a major portion being the salvaging of tactical bridging destroyed by floodwaters. Improvements were made with the aim that they would be of a permanent nature. Many lessons were learned in working with the conditions that come with the annual monsoon season, waterlines being marked and plans laid for swinging and removable bridges.
At the end of September, the United Nations main line of resistance on the I Corps front began to extend North. Many units were planning to move across the Imjin River in preparation for a new offensive, and new bridges across the Imjin River were planned. Plans were also being made to resume peace talks, and the mission of the Battalion as regards the Peace Camp took on added importance.
In October 1951 a team from Company A moved to the Panmunjom Conference Site for the purpose of installing and maintaining barrage balloons. The balloons were filled with hydrogen to definitely outline the cease-fire talk site. Considerable effort was also required to improve Route 1 from the Imjin River to the conference site, so all kinds of vehicles, including sedans could travel over it.
November 1951 saw preparations begun in anticipation of the winter season such as the stockpiling of sand alongside roads, along with repairs being made. Steps were undertaken to replace floating bridges across the Imjin with semi-permanent bridges using rock-filled cribs as piers and the M-2 tread as the roadway. The winterization of the Peace Camp was a main focus of the Battalion.
At the end of the month, the Battalion, minus Company A, was relieved from operational control of the 1169th Engineer Combat Group and attached to the 3rd Infantry Division. Subsequently, the Battalion was then attached to the 10th Engineer Combat Battalion to render engineer support to 3ID, 8th Cavalry Regiment, and later the 180th Infantry Regiment. Company A was attached to the 1092nd Engineer Combat Battalion for operational control, continuing its mission of maintenance at the Peace Camp. LTC Walter R. Arnold assumed command of the Battalion from LTC Charles E. Wright on 1 November.
In December 1951, reconstruction and maintenance of roads continued. The Battalion operated a concertina factory putting out approximately 200 rolls per day. The cutting and stockpiling of logs were detailed because of the need of front line units for their construction of shelters and bunkers. In addition, normal engineer tasks such as bridge construction, culvert laying, mine laying, mine clearing, and reconnaissance were also a big part of the mission. The Battalion took a half-day of rest to celebrate Christmas on the 25th.
At the beginning of January 1952, the Battalion was once again attached to the 1169th Engineer Group. The major effort was road and bridge maintenance because of the icy weather conditions, with about 1400 yards of ditching completed. Company A was tasked with the removal of minefields from Line Golden -- Operation "Thud." The discovery of numerous unrecorded minefields indicated the original estimate of 7,000 mines to be markedly conservative. Cableways were constructed at the Munsan-Ni railroad bridge site (one 400 lb. and two 2,000 lb.); also, a jeep suspension bridge was completed there. A similar cableway was constructed as a back-up measure to the X-Ray Bridge leading to Panmunjom, which since the destruction of the M-2 bridge at Munsan-Ni was the only vehicular route left.
Engineer support was continued at the Munsan-Ni Peace Camp and at Panmunjom. Three airstrips were constructed and a guard tower at I Corps I.W.P. The ice control and maintenance of the X-Ray Bridge was one of the regular missions assigned the unit.
The primary enemy during the month of February 1952 was the ice on the Imjin that threatened the Widgeon and Imjin Bridges. Maintenance of roads, to include resurfacing, continued. Culverts had to be maintained and repaired. Company A reported 55% completion in the mine removal mission on Line Golden. Company C constructed a two-way, Class 50, I-beam bridge on Route 2Z. An operations building and three garages were constructed at one of the airstrips. Engineer support continued at Panmunjom. On the 28th of the month MAJ Harold W. Lubchansky assumed command of the battalion from LTC Walter R. Arnold.
Again, weather determined the mission of the Battalion in March 1952. Emergency repairs to roads and bridges were initiated because of the weather's thawing action and were the highest priority. Company A reported 98% completion of mine removal. Culvert maintenance continued to be necessary.
In April 1952, road and bridge maintenance continued to be a required mission. Debris booms were constructed upstream at various bridges to try to stop the damage that continued to be inflicted by floating debris. In addition to repairing damage inflicted by the winter thaw, preparations were already being made in anticipation of the coming monsoon season. The resurfacing of the Jackson Airstrip with decomposed granite was completed. Engineer support continued at the peace sites. Company A completed their mine removal mission by the month's end. Because of their work on Line Golden — clearing more than ten thousand mines, grenades, and duds during January, February, and March of 1952 and freeing roughly one thousand acres of land for cultivation — Company A was awarded the Republic of Korea Presidential Unit Citation, per Department of the Army General Orders No. 42, 11 June 1954, signed by General Matthew B. Ridgway.
May 1952: Road, bridge, and airstrip maintenance continued. Quarry operations were started this month with 9,310 cubic yards of rock crushed. Construction of a two-way, Class 50 bridge completed. Engineer support continued at the peace sites.
June 1952: Road, bridge, and airstrip maintenance continued. A two-way, Class 50 bridge was constructed. Quarry operations produced 8,270 cubic yards of crushed rock. The Battalion began Operation Amazon -- the preparing of river crossing facilities for the forthcoming flood season; raft equipment was stockpiled, cableways reinforced, approach roads prepared to the high water level mark, upstream and downstream debris booms constructed at each bridge site, and water gages and bench marks were installed. The Battalion also demonstrated mine-clearing operations to the 30th Ordinance Maintenance Company. On 28 June MAJ John P. Agnew assumed command of the Battalion from MAJ Harold W. Lubchansky.
1952–1953: Maintenance, Mine Clearance, and Armistice Support
The battalion maintained bridges, roads, airstrips, peace sites, and mine clearance missions through the armistice period.
July 1952: As expected, the flood season kept the Engineers busy with road, bridge and airstrip maintenance. Roads were now being elevated for use during flood seasons. Quarry operations produced 5,143 cubic yards, and engineer support continued at the peace sites.
August and September 1952: Road, bridge, and airstrip maintenance continued. Quarry operations produced 9,176 cubic yards of crushed rock in August, a Class 50 bridge was constructed, and a POL site was established at the Honker Bridge site for supplies for the erection boats used there. The Battalion was now responsible for 108.5 miles of road for maintenance and repair. Airstrip and quarry operations continued. Company B built an eighty-six pontoon float bridge in 72 hours. Construction of CP bunkers began. Engineer support continued at the peace sites.
October, November and December 1952: Road, bridge, and airstrip maintenance continued. 284 cubic yards of sand was stockpiled for winter use, and engineer support continued. The Battalion was now responsible for 114.4 miles of road maintenance. Cyclone fencing was tried to provide debris fenders at bridge sites. Company B placed a submarine cable across the Han River, five miles north of Seoul. Quarry operations produced 2,265 cubic yards of crushed rock for the month of December. Engineer support continued at the peace sites.
January and February 1953: Road, bridge, and airstrip maintenance continued. A program now underway to resurface all MSRs in the Battalion's area of responsibility and engineer support continued at the peace sites. Quarry operations produced 4,110 cubic yards for the month of February. Company B cleared minefields in the vicinity of Seoul. On 12 February LTC William C. Poole assumed command of the Battalion from MAJ John P. Agnew, and MAJ Agnew assumed the position of battalion executive officer.
March 1953: Road, bridge and airstrip maintenance required nearly all of the Battalion's assets this period because of the heavy rains contributing to numerous road failures. Work began on artillery gun emplacements for the 159th Field Artillery. Quarry operations produced 2,004 cubic yards, and engineer support continued at the peace sites.
April 1953: Road, bridge and airstrip maintenance continued. Preparations for "Operation Little Switch" commenced -- an area for exchange of prisoners of war constructed at Panmunjom. Company A responsible of its maintenance and operation. The spring road reconstruction program began with quarry operations producing 4,527 cubic yards, and the spreading of calcium chloride to reduce dust. 240mm gun emplacements were completed for 159th Field Artillery. Company B cleared minefields north of the Freedom Gate Bridge. Helicopter pads were constructed at I Corps headquarters. Engineer support continued at the peace sites.
May through September 1953: Road, bridge and airstrip maintenance and quarry operations continued. Two M-4 ferries were put into operation on the Imjin River. Two Class 50 bridges were also constructed. Engineer support continued, and the Battalion constructed the First U.S. Corps NCO Academy at Camp Joslyn, Korea.
Source and Use Note
Adapted from the uploaded legacy KoreanWar.html battalion history page, last updated 3 January 2001. The page aligns strongly with the newly recovered commander roster and should be used as the core narrative for a dedicated Korean War page.
Once Rugged, Always Rugged.
More 14th Engineer History
Keep moving through the Rugged Battalion record with the corrected History-section links. These internal links keep visitors inside the archive instead of sending them down the old WordPress goat trails.
Core History References
History Overview →
Return to the central History & Archives hub for the Association’s full history section.
Battalion History →
Read the main narrative history from World War II through the modern era.
Statement of Service →
Review the official-style lineage, activations, redesignations, campaigns, and decorations.
Campaign Maps →
Use the maps page for campaign geography and visual context tied to the battalion’s service.
Unit Awards & Citations →
Trace the unit awards, citations, and supporting order research for the Rugged record.
Commanders →
View the developing roster of Rugged commanders from World War II through the modern 14th BEB era.
Era Pages
World War II History →
Follow the 36th Engineer Combat Regiment and 2827th Engineer Combat Battalion roots.
Korean War History →
You are here: activation in Japan, Pusan, Panmunjom, Line Golden, and armistice support.
Vietnam History →
Move forward into the formal Vietnam history, campaigns, missions, and unit awards.
Swampy Sentinel →
Read the unofficial first-year Vietnam field memory and veteran narrative material.
Post-Vietnam & Fort Ord Era →
Follow the post-Vietnam rebuilding years, Fort Ord service, and transition toward Fort Lewis.
Photo Archives →
Browse Association photo albums and archive images tied to the battalion’s long service.
External Research Sources
U.S. Army CMH Lineage and Honors →
Official lineage, honors, campaign credits, and unit award foundation for the 14th Engineer Battalion.
Army General Orders Unit Award Index →
HRC index used to continue tracing older General Orders and unit award authorities.
DA GO No. 2, 1973 — Presidential Unit Citation →
General Order confirming the Vietnam Presidential Unit Citation for 2d Platoon, Company A as an attached unit.
DA GO 2009-14 — Valorous Unit Award →
General Order confirming the 14th Engineer Battalion Valorous Unit Award for January 2004.
DA GO 2013-62 — Iraq MUC →
General Order confirming the 2008–2009 Meritorious Unit Commendation for HHC, 14th Engineer Battalion and listed units.
DA GO 2013-78 — Afghanistan MUC →
General Order confirming the 2011–2012 Afghanistan Meritorious Unit Commendation for the battalion and listed companies.